<aside>

<aside> <img src="/icons/light-bulb_yellow.svg" alt="/icons/light-bulb_yellow.svg" width="40px" /> NEVER place solid wood or engineered core parts on the concrete floor (the wood absorbs moister in the concrete)

</aside>

The objective is to get the drawers and doors in/on the cabinetry, get any Accessories installed in the cabinetry, get the surface hardware installed on the cabinetry, shrink wrap the cabinetry, and load the cabinetry, wrapping the loaded cabinets with blankets as you go, making sure the cabinetry is adequate protected from damage during transport to the jobsite.

Overview

Sequence of Events

</aside>