<aside> 💡 Click the black triangle on the left of each light bulb icon to expand that topic.

</aside>

1. Get Prospective clients into your database

2. Get Prospective clients a Ballpark Estimate (Room Status should be changed to Ballpark Estimate)

3. Follow-up

4. Get Selections so you can provide a Formal Estimate (Room Status should be changed to Selections)

5. Create and Deliver an Estimate (Room Status should be changed to Estimate)

6. Follow-up AGAIN

7. Field Measure the Project (Room Status should be changed to Field Measure)

8. Create and Deliver a Design (Room Status should be changed to Design)

9. Follow-up AGAIN

10. Double Check Field Measurements for the Project (Room Status should be changed to Check Field Measure)

11. Create and Deliver a Proposal (Room Status should be changed to Proposal)

12. Engineer Project (Room Status should be changed to Engineering)

13. Machine Project (Room Status should be changed to Machine)

14. Finish Project (Room Status should be changed to Finish)

15. Assemble Cabinetry for Project (Room Status should be changed to Assemble)

16. Hardware Cabinetry for Project (Room Status should be changed to Hardware)

17. Deliver Cabinetry for Project (Room Status should be changed to Delivery)

18. Install Cabinetry for Project (Room Status should be changed to Installation)

19. Deposit money into your BANK ACCOUNT (Room Status should be changed while doing a Holy Dance)