<aside>
<aside> <img src="/icons/light-bulb_yellow.svg" alt="/icons/light-bulb_yellow.svg" width="40px" /> NEVER place solid wood or engineered core parts on the concrete floor (the wood absorbs moister in the concrete)
</aside>
The objective is to get all parts machined in the quickest and most efficient way, and as close to one-piece-flow as possible (not large batches). If large batches are imperative, at least break these large batches into smaller transfer batches.
</aside>