<aside>
<aside> <img src="/icons/light-bulb_yellow.svg" alt="/icons/light-bulb_yellow.svg" width="40px" /> NEVER place solid wood or engineered core parts on the concrete floor (the wood absorbs moister in the concrete)
</aside>
The Objective of a Punch List is to list the things that will be needed to complete a Project (2 half finished projects equals precisely ZERO finished projects). The sooner a Project is completed, the sooner we get paid.
A Punch List done well will reduce the number of trips required to finish the Project.
</aside>